Skip to content

Drawings & QA

Every drawing.
Every decision.

A-101 Ground floor plan: drawn by Ben, checked by Priya. The register, redlines and review history stay with Barker St Apartments.

A-101 · Ground floor plan · In review
PDF MarkupBarker St Apartments · A-101 · Review
Preview
A-101 · Ground floor plan · Revision A
Review Revision A 1 markup
FIELDWORKARCHITECTUREGROUND FLOOR PLAN12 0008 000BEDROOM 1BEDROOM 2STUDIO / GUESTLIVING / DININGENTRY LOBBYKITCHEN1NA.101 · GROUND FLOOR PLANREVISION A · SCHEMATIC

Locked for review by Priya. Pin 1 · Lobby door clearance and accessible path.

A-101 · Ground floor plan · In review
PDF MarkupBarker St Apartments · A-101 · Review
Preview
A-101 · Ground floor plan · Revision A
Review Revision A 1 markup
FIELDWORKARCHITECTUREGROUND FLOOR PLAN12 0008 000BEDROOM 1BEDROOM 2STUDIO / GUESTLIVING / DININGENTRY LOBBYKITCHEN1NA.101 · GROUND FLOOR PLANREVISION A · SCHEMATIC

Locked for review by Priya. Pin 1 · Lobby door clearance and accessible path.

Put the instruction on the drawing.

Split a PDF into sheets. Cloud a detail, measure at scale or stamp a check. Assigned comments stay linked to their markups through each revision.

PDF Markup · A-101 Ground floor plan
PDF MarkupBarker St Apartments · A-101 · Review
Preview
A-101 · Ground floor plan · Revision A
Review Revision A 1 markup
FIELDWORKARCHITECTUREGROUND FLOOR PLAN12 0008 000BEDROOM 1BEDROOM 2STUDIO / GUESTLIVING / DININGENTRY LOBBYKITCHEN1NA.101 · GROUND FLOOR PLANREVISION A · SCHEMATIC

Locked for review by Priya. Pin 1 · Lobby door clearance and accessible path.

Assigned to Ben · Checked by Priya
Priya · CheckerGood

Stair rise and going checked against the section. Keep 170 / 280.

Priya · Pin 1Open

Check the lobby door clearance against the accessible path. Show the 920 mm clear opening.

Ben · Reply

Updated the door swing and added the clearance dimension.

Review DecisionDownload PDF
Review status
The sheet’s status is at the top, with Review Decision to hand for the checker.
Markup
The checker’s redline is on the plan.
QA comments
The panel to the right keeps review comments and decisions beside the sheet, assigned to the drafter.
PDF Markup · A-101 Ground floor plan
PDF MarkupBarker St Apartments · A-101 · Review
Preview
A-101 · Ground floor plan · Revision A
Review Revision A 1 markup
FIELDWORKARCHITECTUREGROUND FLOOR PLAN12 0008 000BEDROOM 1BEDROOM 2STUDIO / GUESTLIVING / DININGENTRY LOBBYKITCHEN1NA.101 · GROUND FLOOR PLANREVISION A · SCHEMATIC

Locked for review by Priya. Pin 1 · Lobby door clearance and accessible path.

Assigned to Ben · Checked by Priya
Priya · CheckerGood

Stair rise and going checked against the section. Keep 170 / 280.

Priya · Pin 1Open

Check the lobby door clearance against the accessible path. Show the 920 mm clear opening.

Ben · Reply

Updated the door swing and added the clearance dimension.

Review DecisionDownload PDF

A clear handover, from drawing to release.

Each sheet records its drafter, checker and final checker. Accept the work or return it with the comments attached.

  • Comments reviewed as Good or Redo, and the drafter notified when work is returned or released.
  • Revision lineage: each revision knows what it was based on, and earlier markups stay readable.
  • Compare two revisions side by side to see what changed between issues.
  1. 01
    Drawing

    The assigned drafter develops the sheet.

  2. 02
    Review

    The checker reviews it and records comments. The sheet is locked to them while they do.

  3. 03
    Final Review

    The final checker reviews the drawing before completion.

  4. 04
    Complete

    The sheet’s completed status stays with its task record and its progress.

Review decision
PDF MarkupRiverside House · A.101 · Review
Preview
Review decision · Pin 1
Alex · 4 September, 10:00 amGood · Closed

Please align the terrace threshold with the internal floor finish.

Jamie · 5 September, 10:00 am

Updated the threshold detail for your review. The courtyard paving falls away from the door.

A checked item marked Good. Its Closed label and the reply stay with the drawing as the record of the decision.

Review decision
PDF MarkupRiverside House · A.101 · Review
Preview
Review decision · Pin 1
Alex · 4 September, 10:00 amGood · Closed

Please align the terrace threshold with the internal floor finish.

Jamie · 5 September, 10:00 am

Updated the threshold detail for your review. The courtyard paving falls away from the door.

Which questions still need an answer?

Numbered issues, named assignees and visible answers. Share through client, consultant and contractor portals; keep drafts private until you publish.

  • Filter what is waiting on your team, and what is waiting on someone else.
  • Share work in progress with a client; they can draw and comment, and the studio keeps its own QA.
  • Share selected sets with each consultant firm, and only those sets.
What each portal can see
Client portal · Issues
Issues TrackerRiverside House · Coordination
Preview
Open question and studio response
Maya · Riverside FamilyOpen

Can the courtyard paving continue through the entry?

Alex · StudioReply

Yes. Use the same stone inside and outside, with a slip-resistant finish and a drained threshold externally.

Saved response
Maya · Riverside FamilyDraft · not published

The slip-resistant finish works for us. Please retain the lighter stone tone shown at our review.

Save DraftSend

An open question and the studio’s answer. Below it, the client’s confirmation is still a private draft.

Client portal · Issues
Issues TrackerRiverside House · Coordination
Preview
Open question and studio response
Maya · Riverside FamilyOpen

Can the courtyard paving continue through the entry?

Alex · StudioReply

Yes. Use the same stone inside and outside, with a slip-resistant finish and a drained threshold externally.

Saved response
Maya · Riverside FamilyDraft · not published

The slip-resistant finish works for us. Please retain the lighter stone tone shown at our review.

Save DraftSend

The drawings belong to the project

The scope

The proposal’s deliverables carry their hours into assigned, scheduled tasks.

Planning & Workload

The progress

Review history gives the team evidence of delivery alongside task completion and logged hours.

Time & Progress Billing & Profitability
Take a closer lookExplore the product views behind this page.

The live practice

Open the sheet that is in review.

Open the drawing set, follow a redline and see who drew and checked the sheet.

Enter with your name and work email. No card required.
Next in TrackerPlusBilling & Profitability

Released work becomes progress; progress becomes what you can invoice.