Construction tender management
Look beyond the lowest bid.
Issue a common brief. Compare what each price includes. Keep the questions, revisions and decision with the project.
- Document register
- Invitations
- RFIs
- Addenda
- Acknowledgements
- Submissions
- Weighted comparison
- Decision
A common starting point
Give every bidder the same starting point.
Tender conditions, price schedule and current documents in one register. Invited contractors find the revisions and submission requirements in their portal.
- Bidders see current and superseded revisions, and acknowledge the conditions and each issued addendum.
- Contractors raise RFIs in the portal and save a submission as a draft before completing it.
- A contractor sees only their own invitation and submission.
Two contractors invited, one submission in, five RFIs and two addendums, with the register, RFIs and addendums a click away on the tender’s Tender phase in Document Control.
Buildcraft’s view of the tender: the contact, issue date and closing time, the scope to price, and the conditions it has acknowledged.
Questions and revisions
One numbered update. Every acknowledgement is recorded.
Gather RFIs and revisions into an addendum, review its PDF and issue it. See which contractors have acknowledged the change.
- Each response stays linked to the RFI it answers, and the RFI shows which addendum answered it.
- Duplicate questions can be linked, so one answer covers them.
- The register, RFIs and addendums sit in the tender’s own phase in Document Control, beside the project’s other stages.
RFI-005 on the floor tile allowance, answered with a $65/m² prime cost allowance, above the two answered RFIs from contractors.
ADD-01, final, issued by Hamish Calloway on 24 Oct 2026. ADD-02 is still a draft, and contractors can’t see it until it is marked Final.
The comparison
Compare the scope, as well as the price.
Compare submitted schedules side by side. Add allowances without losing the original bid, score weighted criteria and keep the decision on record.
Three bids line by line, shaded from the lowest price (green) to the highest (red): Clearview’s $298,400 for the shopfront glazing against $309,500 and $312,700.
Price 50%, programme and staging 20%, experience 20%, quality and warranties 10%: weighted scores of 89.6, 83.6 and 81.2, with the studio’s notes.
Buildcraft’s joinery line raised from $61,200 to $71,000 for comparison. Its submitted $655,250 stays visible under the $665,050 analysis total.
- Draft and withdrawn bids stay out of the submitted comparison.
- Programme, commitments and qualifications sit beside the totals, not in a separate email.
- Client Owners can be given a read-only view of the tender’s activity through their portal.
Take a closer lookExplore the product views behind this page.
Which TrackerPlus plan includes construction tender management?
Tenders are part of the Firm plan.
How do contractors take part in a tender?
You invite each contractor, and they work through the contractor portal. There they download the current documents, acknowledge the conditions and each addendum, ask questions and lodge their price schedule. Each bidder works only inside their own invitation.
How is the weighted score worked out?
You set the criteria and their weights, then score each bid out of 100 against every criterion. TrackerPlus combines these into one weighted score per bid. For example, with price at 50%, programme and experience at 20% each, and quality at 10%, three bids might score 89.6, 83.6 and 81.2.
Does the tender stay connected to the rest of the project?
Yes. The tender sits on its own phase in Document Control within the project record, beside the design and documentation stages. The drawing sets you check in Drawings & QA belong to the same project. The client can be given read-only access to follow the tender’s progress.
See it for yourself
See TrackerPlus at work, step by step.
Short videos for owners, staff, clients and consultants, from the first fee proposal to the final invoice.
Free for up to 2 people. Upgrade when you outgrow it.Drawing markup and QA, in the same project record.