Skip to content

Document Control

Know what was issued. And who opened it.

Each stage of a project keeps its own register, RFIs and addendums. Issue documents with a transmittal sheet and a download link for each person, and see exactly who has looked.

  1. Phases
  2. Register
  3. RFIs
  4. Addendums & RFI Responses
  5. Distribution list
  6. Transmittals
  7. Tracked downloads

Phases

Schematic Design to Construction, each with its own numbering.

Add a phase for each stage, or any name you like. RFIs start again at RFI-001 in every phase, so construction’s first question is not RFI-047. Close a phase when the stage is done and it becomes read-only.

Document Control

Barker St’s three phases: Schematic Design and Planning closed, Construction active with open RFIs, a draft and three issues.

Document Control
  • Every tender gets its own Tender phase automatically, with its register, RFIs and addendums already there.
  • With project folders in TrackerPlus Files, each phase and discipline gets its own folder.

The register

One current revision, and the history behind it.

Upload documents in bulk by discipline. Uploading a new version supersedes the old one and keeps the chain; every download, by staff or through a portal, is counted.

Barker St Apartments · Construction · Register

The architectural sheets in the Construction register, with their revisions, issue dates and download counts.

Barker St Apartments · Construction · Register

RFIs and responses

Questions in. Numbered answers out.

Log RFIs, split part of a question into a sub-RFI and link duplicates so one answer covers them. During tender, answers go out as addendums; during construction they go to the builder as RFI Responses, written for the building contract. AI Rewrite turns rough notes into formal wording for either.

Construction · RFIs

RFI-002 on the bathroom set-downs, with a sub-RFI on the floor-waste falls.

Construction · RFIs
Construction · RFI Responses

RR-01, a draft answer to the builder’s window head flashing RFI.

Construction · RFI Responses

Transmittals

Issue a set. Watch it land.

Pick documents from the register and people from the project’s distribution list, which suggests its consultants and contractors. Each person gets an email with a transmittal sheet PDF, the drawings when they fit, and their own download link that needs no login.

Construction · Issues

Three transmittals and a draft, with how many recipients were sent, viewed and downloaded, and one bounced address.

Construction · Issues

Every recipient, accounted for.

  • Sent, Viewed, Downloaded or Failed for each person, with when and how many times.
  • Resend with a fresh link, copy a link to send another way, or revoke every link on the issue.
  • Recipients download each document or everything as one zip, and can fetch the transmittal sheet again.
TX-003 · recipients

TX-003: viewed by Clearspan, downloaded three times by Rivulet, and a bounced address at Ember.

TX-003 · recipients

Consultant and contractor portals

Their own record of everything you sent them.

Consultants and contractors with a portal login find every transmittal issued to their firm under Documents, by project and phase. Links there never expire.

Consultant portal · Documents

Tom Chen of Clearspan Engineering sees the transmittals issued to Clearspan across Marlow Terraces and Barker St.

Consultant portal · Documents

See it for yourself

Open Barker St’s Construction phase in the live practice.

The register, RFIs, the draft RFI Response and three transmittals are all there.

Enter with your name and work email. No card required.
Next in TrackerPlusTenders

Bids, addenda and a weighted comparison, in the Tender phase.

Best on a bigger screen

The live demo is available on desktop.

It is a full working practice, with programmes, drawings in review and billing laid out for a bigger screen, so it is not available on phones. Open this page on a laptop or desktop computer to step inside.

Questions first? Talk to us